A mixed order is how most importers start working with a Chinese appliance supplier: a few SKUs of countertop ovens, some range hoods, replacement motors and control boards, plus spare parts for after-sales. The hard part is not finding the products. It is knowing what the order will really cost once it reaches your warehouse. Below is a line-by-line budgeting worksheet you can rebuild in a spreadsheet before you ask for a quotation.
A single-SKU order has one unit price, one packing scheme and one duty classification. A mixed order has several of each at the same time. One carton may hold finished toaster ovens as complete built-up units, another holds semi-knocked-down oven kits, a third holds loose blender blade assemblies and drive couplers. Those three cartons can attract different customs treatment, take up different container space and carry different after-sales risk, even though they travel in the same container.
The worksheet separates three things that importers usually lump together: the cost of buying, the cost of importing, and the cost of supporting the goods after arrival. Budget only the first one and your margin disappears somewhere between the port and your shelf.
Build one row per SKU or per kit type. Fill each column with a figure taken from a document: a quotation, a packing list, a freight quote, written advice from your customs broker. Not an estimate.
| Line item | What goes in it | Where the figure comes from |
|---|---|---|
| Unit price with trade term | Price per unit or per kit, stated as EXW, FOB or another Incoterm | Supplier proforma invoice, valid for a named period |
| Supply mode | CBU finished unit, SKD semi-knocked-down kit, or CKD complete knock-down kit | Supplier packing list and product description |
| MOQ and order multiple | Minimum per SKU, units per carton, cartons per pallet | Supplier quotation; check it against your shelf space |
| Tooling amortisation | Mould or tooling cost divided by the units you expect to sell | Mould quotation; only for private-label or custom parts |
| Sample and pre-production cost | Samples, first-article check, any modification round | Your own purchase record; do not leave it out |
| Inland transport to port | Trucking from the factory to the loading port | Supplier or forwarder quotation |
| Ocean freight and surcharges | Freight plus bunker and terminal charges for the container you need | Forwarder quotation dated close to your shipping window |
| Insurance | Cargo cover for the declared value | Insurer or forwarder policy |
| Duty and import tax | Rate applied to each declared classification | Your customs broker's written classification advice |
| Clearance and port charges | Broker fee, documentation, storage, demurrage buffer | Local broker tariff; add a buffer for delays |
| Inland delivery to warehouse | Last-mile transport plus unloading labour | Local carrier quotation |
| Inspection and rework | Pre-shipment inspection, incoming check, repack or repair allowance | Your own standard, or a third-party inspection fee |
| Spare-parts float | Budget for the stock you must hold to honour warranties | Calculated from the SKU list, see Part 4 |
| Currency and payment cost | Transfer fees plus an exchange-rate buffer between quote and payment | Your bank's terms; write the buffer percentage into the sheet |
The supply-mode column is not a detail. It changes your unit price, your freight and your duty rate together. Finished units arrive ready to sell but occupy the most container space and are usually classified as complete appliances. SKD kits arrive with core modules already assembled, so local work is limited to fitting shells, handles and small parts. CKD kits arrive fully separated and need local assembly, wiring, testing and inspection, but they flat-pack tightly and are normally declared as parts.
Our SKD vs CKD buyer guide sets out how the three modes differ in assembly effort, shipping volume and import cost, and how to reduce kitchen appliance import costs covers packing and ordering tactics. Read both before you decide which mode each line of your worksheet should use.
Two practical points:
Model duty as a range, not a point. Rates differ by destination and by how customs reads your packing. Ask your broker for the rate on finished units, semi-knocked-down kits and loose parts separately, then run the order through all three columns.
Model freight per cubic metre, not per unit. Flat-packed kits change how many units fit in a container, so a per-unit freight figure hides the saving. Take carton dimensions from the packing list and calculate units per container yourself.
Ocean freight, clearance fees and inspection are paid once for the shipment but have to be spread over SKUs if you want a real margin per product. Two allocation bases work well:
By shipped volume (cubic metres) - fair for freight and warehouse space. A bulky finished oven carries more of the freight bill than a carton of heating elements.
By declared value - fair for insurance, finance cost and any percentage-based handling on duty.
Keep tooling out of the shared pool. A custom blender jar injection mould or a bespoke oven sheet-metal tool belongs to one product family; amortising it across the whole container makes unrelated SKUs look worse than they are.
Mixed orders combine finished appliances with loose components, which is exactly what you want for service. A blender that fails in the field needs a replacement blade assembly or a drive coupler, not a whole machine. An oven whose temperature drifts needs a control board PCBA, a timer or a thermostat. Budget that stock in the same worksheet as the main order, otherwise your first warranty claim comes straight out of profit.
A simple way to size it:
List the wear items for each appliance type: motors, heating elements, blades, couplers, capacitors, boards, knobs, door glass.
Set a spares ratio you are willing to carry for each, and write your reasoning in the sheet so it can be reviewed on the next order.
Ship service parts in the same container as the main order. Loose parts travel cheaply and arrive when the product does.
Keep after-sales part numbers identical to production part numbers. A substitute coupler or board that looks similar but is not compatible creates a cost line nobody budgeted for.
Before you send this worksheet to a home appliance OEM ODM supplier, check that their quotation answers the same questions:
Is the price stated with an Incoterm and an expiry date?
Does each line say CBU, SKD or CKD, and does the packing list match that claim?
Are certification documents listed per model rather than as a company-level statement?
Is tooling quoted separately from unit price, with mould ownership defined in writing?
Are sample cost, first-article lead time and payment milestones written down?
A quotation that leaves those five points open is not a budget input; it is a negotiation starting point. Enter the gaps as unknowns and close them in writing before you commit funds.
You do not need real numbers to see how a first mixed order should be structured. Group the lines by the job each one does for you:
| Group | Purpose in the order | Budgeting note |
|---|---|---|
| Finished countertop ovens and air fryer ovens | Immediate retail sell-through, fast turnover | Highest freight per unit; confirm duty treatment as complete appliances |
| Ovens supplied as SKD or CKD kits | Denser loading and lower declared value, with local assembly | Add local labour, testing and any tooling to the line |
| Range hoods and their motors | Category breadth for the same kitchen customer base | Motors are heavy; watch volumetric weight in the freight quote |
| Blender parts: blades, couplers, jars, switches | Consumables and service stock that keep machines selling | Small volume, low freight share, useful for filling container space |
| Induction coil plates and transformers | Custom specification work for your own models | Confirm specification and sample approval before any tooling spend |
| Refrigerator and washing machine spares | After-sales revenue and repeat purchase from the repair trade | Order against your installed base, not as filler |
Landed cost per SKU is calculated line by line, not estimated from a unit price.
Duty classification for each supply mode has been confirmed in writing by your own broker.
Container loading has been recalculated from packing-list dimensions, so freight per unit is real.
Service parts float is inside the order, with part numbers matching production parts.
Currency buffer and payment schedule are agreed, with the exchange-rate assumption written in the sheet.