A custom ferrite transformer sits at the centre of an appliance switching power supply, yet it is often treated as a small commodity line item on a purchase order. That is where disputes begin. When the winding scheme, the insulation system and the test method are all written into the agreement before tooling or first articles are produced, both sides save weeks of rework. Below is the list of terms we ask our overseas buyers to settle in writing for custom SMPS ferrite transformer projects for induction cookers, ovens and other small kitchen appliances.
A quotation is only comparable to another quotation if both are built on the same definition. In the agreement, fix the working frequency band, input voltage, each output voltage with its current, and the required inductance measured at a defined test condition (frequency and level of measurement signal). Our standard product data covers ferrite core transformers operating in the 20kHz–500kHz range; the exact core geometry — EE, EF, EFD or RM series, from small EE13/EE16/EE19 types upward — is confirmed against your circuit scheme, not chosen from a catalogue alone.
Also state how much leakage inductance your converter expects. We wind with automated equipment so that inductance and leakage inductance stay consistent from batch to batch, which keeps ripple on the control board predictable; the agreed tolerance band is what your incoming inspection will check.
Before shipment we test every unit for inductance, leakage inductance, turns ratio, hipot withstand voltage, continuity and no-load heating. In the agreement, write down which of these items are contractual, on what sample basis (100% or AQL sampling), with what instrument and fixture, and at what limits. Then define the two things buyers most often forget: who pays for re-test when a batch fails, and how a disputed result is resolved — usually by sending retained samples to a mutually accepted third-party laboratory.
Sample lead time is 3–7 days, and mass production runs 12–20 working days after sample confirmation. Make "sample confirmed" a defined event in the contract: signed or stamped drawings, a retained golden sample held by each side, and a written record of which revision was approved. Any later change to turns ratio, pin layout or bobbin should be handled as a named engineering-change step with its own price and lead-time effect, not as an informal email request.
| Term | What to clarify in writing |
|---|---|
| MOQ | For a custom transformer the MOQ depends on the structure, so state it per model. Standard models are kept in stock and can be ordered as samples. |
| Tooling and bobbin cost | Whether new bobbin or fixture cost is one-off or amortised into unit price, and who owns the tooling if volumes change. |
| Price validity and copper | How long the quoted price holds, and the review rule if raw copper or ferrite moves materially during a long contract. |
| Delivery and packaging | Lead time from confirmed sample, packing method for PCB components, and incoterms for the shipment. |
| Warranty | Coverage period, what counts as a field failure versus damage during your own soldering or wave-solder process, and the credit or replacement rule. |
| Exclusivity and IP | Whether your winding scheme and drawings stay confidential and are not supplied to a third party. |
Transformer buyers usually source it alongside other board-level components. We supply appliance transformers together with range hood control boards and power supply boards, induction heating coil plates and motors, so one agreement can cover several parts of the same appliance bill of materials. That reduces interface risk: when a control board and its power transformer come from the same supplier, insulation coordination and interference behaviour are easier to settle during your own validation.
As an OEM/ODM home appliance supplier based in Zhongshan, Guangdong, we also support finished units and SKD/CKD kits when a customer moves from component sourcing to appliance assembly at destination.
Before you sign — quick checklist
Specifications such as core type, inductance tolerance, insulation class and test limits are confirmed project by project against your circuit scheme; the figures above describe our usual offering rather than a fixed datasheet value.